Nissan Murano: Driveline :: Transfer: Ty21c / Unit Disassembly and Assembly
Exploded View
Transfer assembly
Transfer gusset
Rear gusset
: Nissan Murano Vehicle front
: N·m (kg-m, ft-lb)
Removal and Installation
NOTE:
When removing components such as hoses, tubes/lines, etc...
Exploded View
Oil seal
Transfer cover
Filler plug
Gasket
Drain plug
Oil seal
O-ring
Ring gear bearing adjusting shim (transfer cover side)
Ring gear bearing (transfer cover side)
Drive shaft oil seal
Ring gear shaft
Ring gear bearing (transfer case side)
Ring gear bearing adjusting shim (transfer case side)
Ring gear
Baffle plate
Transfer case
Plug
O-ring
Oil seal
Dowel pin
Drive pinion
Drive pinion adjusting shim
O-ring
Pinion bearing assembly
Oil seal
Dust cover
Companion flange
Pinion lock nut
Oil seal lip
Comply with the assembly procedure when tightening...
Other information:
Work Procedure
INSPECTIONCheck the engine oil level. Replenish if necessary. Refer to Inspection.
Check for leak of the CVT fluid. Refer to Inspection.
Drive for about 10 minutes to warm up the Nissan Murano vehicle so that the CVT fluid temperature is 50 to 80°C (122 to 176°F)...
Inspection
LOOSENESS OF CONNECTED PARTCheck each fixing bolt and nut for looseness using torque wrench. For each tightening torque, refer to Exploded View.BACKLASH OF JOINT PARTMove the joint of propeller shaft up and down and from side to side (axial direction of shaft and right angle to shaft) to check that the joint has no backlash...