Description
To provide improved corrosion prevention, the following anti-corrosive measures have been implemented in NISSAN production plants. When repairing or replacing body panels, it is necessary to use the same anti-corrosive measures...
Inspection and Repair
INSPECTIONWhen measuring voltage, wrap tin foil around the top of the negative probe. Then press the foil against the wire with your finger.
Attach probe circuit tester (in Volt range) to middle portion of each filament.
If a filament is burned out, circuit tester registers 0 or battery voltage...