Nissan Murano: Dtc/circuit Diagnosis / Power Supply and Ground Circuit

Nissan Murano (Z52) 2015-2024 Service Manual / Brakes / Brake Control System :: Vdc/tcs/abs / Dtc/circuit Diagnosis / Power Supply and Ground Circuit

Diagnosis Procedure

CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT) IGNITION POWER SUPPLY

  1. Ignition switch OFF.

  2. Disconnect ABS actuator and electric unit (control unit) harness connector.

  3. Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.

    ABS actuator and electric unit (control unit)

    Voltage

    (Approx.)
    Connector Terminal
    E125 28 Ground 0 V
  4. Ignition switch ON

    NOTE:

    Start the engine.

  5. Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.

    ABS actuator and electric unit (control unit)

    Voltage

    (Approx.)
    Connector Terminal
    E125 28 Ground Battery voltage

Is the inspection result normal?

YES>>

GO TO 3.

NO>>

GO TO 2.

CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT) IGNITION POWER SUPPLY CIRCUIT

  1. Ignition switch OFF.

  2. Check the 10A fuse (46).

  3. Disconnect IPDM E/R harness connector.

  4. Check the continuity between ABS actuator and electric unit (control unit) harness connector and IPDM E/R.

    ABS actuator and electric unit (control unit) IPDM E/R Continuity
    Connector Terminal Connector Terminal
    E125 28 E119 35 Yes
  5. Check the continuity between ABS actuator and electric unit (control unit) harness connector and ground.

    ABS actuator and electric unit (control unit) Continuity
    Connector Terminal
    E125 28 Ground No

Is the inspection result normal?

YES>>

Perform trouble diagnosis for ignition power supply.

NO>>

Repair / replace harness, connector, or fuse.

CHECK MOTOR AND MOTOR RELAY POWER SUPPLY

  1. Ignition switch OFF.

  2. Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.

    ABS actuator and electric unit (control unit)

    Voltage

    (Approx.)
    Connector Terminal
    E125 1 Ground Battery voltage
  3. Ignition switch ON.

    NOTE:

    Start the engine.

  4. Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.

    ABS actuator and electric unit (control unit)

    Voltage

    (Approx.)
    Connector Terminal
    E125 1 Ground Battery voltage

Is the inspection result normal?

YES>>

GO TO 5.

NO>>

GO TO 4.

CHECK MOTOR AND MOTOR RELAY POWER SUPPLY CIRCUIT

  1. Ignition switch OFF.

  2. Check the 60A fusible link (J).

  3. Check the continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal 1 and 60A fusible link (J).

Is the inspection result normal?

YES>>

Perform trouble diagnosis for battery power supply.

NO>>

Repair / replace harness, connector, or fusible link.

CHECK ACTUATOR RELAY, ABS IN VALVE, ABS OUT VALVE POWER SUPPLY

  1. Ignition switch OFF.

  2. Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.

    ABS actuator and electric unit (control unit)

    Voltage

    (Approx.)
    Connector Terminal
    E125 25 Ground Battery voltage
  3. Ignition switch ON

    NOTE:

    Start the engine.

  4. Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.

    ABS actuator and electric unit (control unit)

    Voltage

    (Approx.)
    Connector Terminal
    E125 25 Ground Battery voltage

Is the inspection result normal?

YES>>

GO TO 7.

NO>>

GO TO 6.

CHECK ACTUATOR RELAY, ABS IN VALVE, ABS OUT VALVE POWER SUPPLY CIRCUIT

  1. Ignition switch OFF.

  2. Check the 30A fusible link (I).

  3. Check the continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal 25 and 30A fusible link (I).

Is the inspection result normal?

YES>>

Perform trouble diagnosis for battery power supply.

NO>>

Repair / replace harness, connector, or fusible link.

CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT) GROUND CIRCUIT

Check the continuity between ABS actuator and electric unit (control unit) harness connector and the ground.

ABS actuator and electric unit (control unit) Continuity
Connector Terminal
E125 13 Ground Yes
38

Is the inspection result normal?

YES>>

GO TO 8.

NO>>

Repair / replace harness, connector, or terminal.

CHECK TERMINAL

  1. Check the ABS actuator and electric unit (control unit) pin terminals for damage or loose connection with harness connector.

  2. Check the IPDM E/R pin terminals for damage or loose connection with harness connector.

Is the inspection result normal?

YES>>

Replace the ABS actuator and electric unit (control unit). Refer to Removal and Installation.

NO>>

Repair / replace harness, connector, or terminal.

    U1002 System Comm (can)

    DTC Description DTC DETECTION LOGIC DTC No. CONSULT screen item (Trouble diagnosis content) DTC detected condition U1002 SYSTEM COMM (CAN) (CAN system communication) Diagnosis condition When ignition switch ON...

    Parking Brake Switch

    Component Function Check CHECK PARKING BRAKE SWITCH OPERATION Check that brake warning lamp in combination meter turns ON/OFF when parking brake is operated...

    Other information:

    Nissan Murano (Z52) 2015-2024 Service Manual: C1a15-64 Gear Position


    DTC Description ADAS control unit judges the gear position based on the following signals. Current gear position signal transmitted from TCM via CAN communication. Value of gear ratio calculated from input speed signal transmitted from TCM via CAN communication...

    Nissan Murano (Z52) 2015-2024 Owners Manual: Chassis and body maintenance


    Brake lines and cables: Visually inspect for proper installation. Check for chafing, cracks, deterioration, and signs of leaking. Replace any deteriorated or damaged parts immediately. Brake pads and rotors: Check for wear, deterioration and fluid leaks...

    Categories

    read more

     
    Copyright © 2025 www.nimurano.com