Nissan Murano: Interior Lighting System :: Removal and Installation / Illumination Control Switch
Removal and Installation
The illumination control switch is serviced as part of the meter control switch. Refer to Removal and Installation.
Removal and Installation
FRONT CONSOLERemovalRemove center console upper side finisher. Refer to Exploded View.
Remove mood lamp (front console) (1) screw (B)...
Bulb Specifications
Item Wattage (W)*
Front room/map lamp assembly
–
Vanity lamp
2
Glove box lamp
1.4
Personal lamp 2nd row
–
Luggage room lamp
5
Mood lamp (front console)
–
Mood lamp (rear console)
–
Mood lamp (door armrest)
–
*: Always check with the Parts Department for the latest parts information...
Other information:
Removal and Installation
REMOVALRemove the luggage side lower finisher (RH). Refer to Removal and Installation.
Remove the center pillar lower finisher (RH). Refer to Removal and Installation.
Release clips using a suitable tool and remove rear seat belt center retractor finisher...
Description
Perform action test to verify the customer's concern.
Perform action test and check the system operation after system diagnosis.
Inspection Procedure
CHECK AEB SYSTEM SETTING
Start the engine.
Check that the AEB system setting can be enabled/disabled on the Nissan Murano vehicle information display...