Nissan Murano: Dtc/circuit Diagnosis / Combination Switch Input Circuit

Nissan Murano (Z52) 2015-2024 Service Manual / Electrical & Power Control / Body Control System :: Bcm / Dtc/circuit Diagnosis / Combination Switch Input Circuit

Diagnosis Procedure

CHECK INPUT 1 - 5 SYSTEM CIRCUIT FOR OPEN

  1. Ignition switch OFF.

  2. Disconnect BCM connector and combination switch connector.

  3. Check continuity between BCM harness connector and combination switch harness connector.

    Combination switch signal BCM Combination switch Continuity
    Connector Terminal Connector Terminal
    INPUT 1 M19 79 M28 11 Yes
    INPUT 2 78 9
    INPUT 3 77 7
    INPUT 4 76 10
    INPUT 5 75 13

Is the inspection result normal?

YES>>

GO TO 2.

NO>>

Repair or replace harness or connectors.

CHECK INPUT 1 - 5 SYSTEM CIRCUIT FOR SHORT

Check continuity between BCM harness connector and ground.

Combination switch signal BCM Ground Continuity
Connector Terminal
INPUT 1 M19 79 No
INPUT 2 78
INPUT 3 77
INPUT 4 76
INPUT 5 75

Is the inspection result normal?

YES>>

GO TO 3.

NO>>

Repair or replace harness or connectors.

CHECK BCM OUTPUT VOLTAGE

  1. Connect BCM connector and combination switch connector.

  2. Ignition switch ON.

  3. Check voltage between BCM connector and ground.

    (+) (–) Voltage
    Combination switch signal BCM
    Connector Terminal
    INPUT 1 M19 79 Ground Refer to Reference Value.
    INPUT 2 78
    INPUT 3 77
    INPUT 4 76
    INPUT 5 75

Is the inspection result normal?

YES>>

Replace the combination switch. Refer to Removal and Installation.

NO>>

Replace BCM. Refer to Removal and Installation.

    Power Supply and Ground Circuit

    Diagnosis Procedure CHECK FUSE AND FUSIBLE LINK Check that the following fuse and fusible link are not blown: Terminal Signal name Fuse or fusible link No...

    Symptom Diagnosis

    ..

    Other information:

    Nissan Murano (Z52) 2015-2024 Owners Manual: BSW system limitations


    WARNING Listed below are the system limitations for the BSW system. Failure to operate the vehicle in accordance with these system limitations could result in serious injury or death. The BSWsystem cannot detect all vehicles under all conditions...

    Nissan Murano (Z52) 2015-2024 Service Manual: Main Power Supply and Ground Circuit


    Diagnosis Procedure CHECK TCM POWER CIRCUIT (PART 1) Turn ignition switch OFF. Disconnect TCM connector. Check voltage between TCM harness connector terminals and ground. + − Voltage TCM Connector Terminal F25 45 Ground 10 – 16 V 46 Is the inspection result normal? YES>> GO TO 2...

    Categories

    Front manual seat adjustment (if so equipped)

    Your vehicle seats can be adjusted manually. For additional information about adjusting the seats, refer to the steps outlined in this section.

    Forward and backward

    Nissan Murano. Front manual seat adjustment (if so equipped)

    read more

     
    Copyright © 2026 www.nimurano.com